Aerial view of a weighbridge lane carrying heavy vehiclesFIG. 01  /  FIELD HARDWARE

PRODUCT 02 / PERMANENT WEIGHBRIDGES

Steel Weighbridge Deck, Welded to Outlast the Load

A fixed weighbridge is a structure first and an instrument second. Jiajia Forge builds U-shaped steel fully-welded closed-cavity decks for sites that will cycle thousands of times a week, in coastal air, mine dust and wash-down bays, year after year.

2Mcycles fatigue tested
≥120µm dry film
Sa2.5blast grade
20/50/100ton capacity

01 / CLOSED CAVITIES, NOT OPEN RIBS

Torsion is what opens weld seams.

An open-rib deck is lighter on paper, but an off-centre load twists it. Repeated twisting is what opens seams and drifts calibration on a busy lane.

Gantry structure above a permanent weighbridge lane

STRUCTURAL LOGIC

Carry the load with the whole deck.

We use U-shaped steel sections welded into closed box cavities, so torsional load is carried by the complete structure rather than a single rib. Fully welded seams also deny water and grit a place to sit, which is where corrosion starts on a permanent installation.

It is a heavier way to build, and it is deliberate: the decks that stay in calibration are usually the ones that refuse to flex.

02 / A COATING SYSTEM YOU CAN MEASURE

Paint thickness is not a marketing phrase.

On a weighbridge it is the difference between a deck that keeps its calibration environment and one that starts rusting from the underside up.

StructureU-shaped steel, fully welded closed cavities
Surface preparationSa2.5 shot blasting
CoatingDouble-bottom, double-side paint system
Dry film≥120 µm
Fatigue validationThird-party 2-million-cycle test
Standard deck3500×1000 mm
Widened deck4200×1000 mm
Multi-deckZDG combinations for different wheelbases
Nominal capacity20 / 50 / 100 ton
Load cell assembly fitted beneath a weighbridge deck

WHY THE UNDERSIDE MATTERS

Blast to Sa2.5, then coat both faces.

Shot blasting to Sa2.5 gives the primer a mechanical key rather than a cosmetic one. Coating the underside as well as the top face matters because the underside is the part nobody inspects and the part that fails first on a damp or saline site. A dry film of at least 120 µm is the figure we work to, and it is a figure you can check on delivery with a gauge.

Static strength is easy to claim and hard to check. What matters on a busy lane is what happens after repeated loading, so the deck structure is validated in a third-party 2-million-cycle fatigue test. We would rather find a weld detail that needs work in a test rig than on an operator's lane.

03 / SIZES AND COMBINATIONS

Configurable, not one-size-fits-all.

Deck dimensions are configurable. Tell us the longest vehicle and the wheelbase spread and we will propose either a single deck or a ZDG multi-deck combination. The 3500×1000 mm and widened 4200×1000 mm decks cover most rigid trucks and trailers; combinations cover the mixed fleets that do not fit either.

01

Send the fleet

Vehicle list, maximum axle load and the longest wheelbase on the lane.

02

Receive a layout

A single deck, a widened deck, or a ZDG combination with the capacity chosen from 20, 50 or 100 ton.

03

Confirm the site

Foundation, drainage and access requirements set out before fabrication starts.

NEXT STEP  /  01

Tell us what you need to weigh.

Send the axle loads, deck size and site conditions. We will come back with a factory quote, the trade terms and a delivery window you can plan around.

Request a Factory Quote